The problem: release paperwork that slows shipping
A passing batch still needs approval, a certificate and a signature before it ships. Doing that by hand delays release and leaves gaps in the record.
Results pass, but the batch still waits for someone to compare them with the spec, fill in a certificate and collect a signature. Each handoff adds a delay, and each manual step is a chance for a gap in the record.
What this demo shows
- Open a production lot approval with the spec built in.
- Generate the certificate of analysis.
- Sign and lock the record, with every step logged.
Why it matters
Release speed matters to the plant and to the customer waiting on the shipment. An approval request with the spec built in, a one-click certificate and an electronic signature removes most of the manual steps.
Every step is logged, so the record of who approved what, and when, is ready for any audit or customer question.
See it with your own data
This video is part of QC LIMS. To see how it would work with your own formulations and records, request a demo. Our team replies within 30 minutes during business hours.
Read the transcript
Uncountable is one platform for R&D, quality, and the product life cycle. The production lot approval request for this batch lists every required test and its range. Every result meets the spec, and the technician submits the check. One click fills the certificate with each test, its requirement, and its result from the spec and the tested batch.
The results come straight from the tested batch, so none is retyped. The request moves through its approval phases. The record keeps who approved it and when. Then, the batch record is locked and signed with a personal PIN. The audit log shows the lock and the signature. See how Uncountable connects quality, R&D, and the product record.
